|
Orpington railway station serves the town of Orpington in the London Borough of Bromley, and is in Travelcard Zone 6. Located in Crofton Road, the station is a west of the southern end of Orpington High Street. The station is on the South Eastern Main Line. The station has eight platforms. Platform 1 is a bay platform which is rarely used. Platform 2 is used for fast services to Charing Cross or Cannon Street . Platforms 3 and 4 are an island, 3 used by trains towards Ashford International or Tunbridge Wells and 4 by stopping services from Sevenoaks to Charing Cross or Cannon Street. Platform 5 hosts the Sevenoaks slows with platforms 6-8 being bay platforms used by services starting at Orpington towards Charing Cross, London Victoria, Cannon Street and Luton/Bedford. At the country end, the four tracks become two. At the London end there is a stabling and servicing area for trains. There are two entrances, both with ticket offices and ticket barriers, the main one on the platform 1/2 side (Crofton Road), the other on the platforms 5-8 side (Station Approach and the bus interchange). Access to platforms is via an underground subway (unsuitable for wheelchair users) or via a new bridge opened in 2008 which incorporates lift access to all platforms. == History == The station was opened on 2 March 1868 by the South Eastern Railway (SER), when the SER opened its cut-off line between Chislehurst and Haysden Junction. Previously, trains between London and Tunbridge Wells had taken a circuitous route via Redhill. The line was widened and the station rebuilt in 1904, expanding to six platforms. Third rail electrification reached Orpington in 1925, and extended to Sevenoaks ten years later. About this time the Southern Heights Light Railway was proposed, which would have diverged from the main line south of Orpington and finished at . Crofton Roman Villa was partly destroyed by a railway cutting in the late 1800s but was (re)discovered in 1926 when work was carried out to the area to the west of the station entrance as an entrance to a new council building. Platforms 7 and 8 were built in the early 1990s on the site of former carriage sidings. In 2008, the station became fully accessible following the opening of a new footbridge providing lift access to all platforms. In 2013 the former steam locomotive shed (closed for steam in 1926 in use as sidings until 1960) is still standing converted to offices (sited adjacent to platform 8). In 2014 the car park was rebuilt with 2 stories to increase capacity. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Orpington railway station」の詳細全文を読む スポンサード リンク
|